Consists of three parts, steel structure welding forming, hydraulic drive part, PLC automatic control parts. Each die set for independent control system, separate PLC control, at the bottom of the formwork installation has four castor, convenient to move. Die set have swing function, namely the mold after the injection of foaming materials, automatically rotating equipment, increase the foaming materials in the liquid inside the mold, at the same time let foaming materials A and B material in secondary mixed within the mold, ensure the quality of the product percent of pass and swing Angle, and swing time users can set according to the needs of the production process adjustment. Equipment installation timer, raw material into a mold, start time, curing, after the completion of the mould open automatically.
Copyright ? 2013 - Zhejiang lingxin polyuretane co., LTD 浙ICP備14042619號(hào)-1
Address:Ruian international automobile industrial park road rossi Tel:400 826 8887